
Cost of Stone Driveway Construction in Franklin
Constructing a stone driveway in Franklin, TN, can be a valuable investment, enhancing both the aesthetic appeal and functionality of your property. Understanding the various factors that influence the cost and the common tasks involved can help you plan and budget effectively.
Factors Affecting Cost
- Stone Material: The type of stone selected, such as granite, limestone, or cobblestone, significantly impacts the overall cost.
- Driveway Size: Larger driveways require more materials and labor, thus increasing the total expense.
- Labor Rates: Local labor costs in Franklin, TN, can vary, influencing the final price.
- Site Preparation: The condition of the existing site, including the need for excavation or grading, affects the cost.
- Design Complexity: Intricate designs or patterns can increase labor time and cost.
- Drainage Systems: Proper drainage installation is essential and adds to the overall expense.
- Permits and Regulations: Local permits and adherence to regulations can incur additional costs.
Average Costs for
Task | Average Cost (Franklin, TN) |
---|---|
Basic Stone Driveway Installation | $3,000 - $5,000 |
Excavation and Site Preparation | $800 - $2,000 |
High-End Material (e.g., Granite) | $10 - $20 per sq. ft. |
Standard Material (e.g., Limestone) | $5 - $10 per sq. ft. |
Drainage System Installation | $1,000 - $3,000 |
Labor Costs | $50 - $100 per hour |
Permit Fees | $100 - $500 |
Understanding these factors and average costs will help you make informed decisions when planning your stone driveway construction project in Franklin, TN.